Portfolio Margin

  • Updated

In an account with portfolio margin enabled, the portfolio of positions in the account are looked at together, and the portfolio is stress tested against various scenarios. The worst performing of the tested scenarios is used to calculate the total margin requirements. The simple IM and MM formulas used in standard margin accounts do not apply to portfolio margin accounts.

Deribit supports 2 portfolio margin models:

  • Segregated Portfolio Margin (S:PM)

  • Cross Portfolio Margin (X:PM)

Segregated Portfolio Margin (S:PM)

Segregated Portfolio Margin Overview

  • Each of the settlement currencies is treated separately.

  • Within each settlement currency though, all of the positions that use that settlement currency are looked at together.

  • The margin requirements are calculated based on the worst performing of the stress test scenarios for that currency.

Segregated Portfolio Margin Components

The portfolio is tested against various scenarios, with the worst performing scenario being used to calculate the margin requirements. There are several components that go into the stress test scenarios. The details, up to date values, and the results of each of the scenarios, can be found on the margin page. A summary of the main components of the calculation are listed below:

  • Maximum underlying price move e.g. +/-16%. This is broken down into 9 evenly spaced buckets from the bottom of the range to the top, including a bucket for zero price movement.

  • Volatility Stress Scenarios (Volatility Range Up, Same, and Down) are calculated for each bucket of underlying price move.

  • Extended Table - this is primarily meant to account for large short options positions that are far out of the money.

    • Calculations of price moves of, e.g. -66%, -33%, +50%, +100%, +200%, +300%, +400%, +500%

    • Only on Volatility Range Up

    • Only a fraction of simulated P&L

    • Application of a dampener

  • Delta Shock.

  • Roll Shock.

  • Position Initial Margin = Worst case loss scenario of risk matrix (including extended table) per Base Currency + Delta Shock + Roll Shock

  • Maintenance Margin = Position Initial Margin * Maintenance Margin Factor

    (the default Maintenance Margin Factor is 0.80)

  • Position Initial Margin is added with the Initial Margin for open orders and Initial Margin for MMP Settings to give the final Initial Margin.

Segregated Portfolio Margin Delta Shock

  • Delta shock is calculated per currency pair for large delta positions.

  • The margin system looks at the net delta on long option positions separately to futures and short option positions.

  • The net deltas on long options are not taken into account unless they help offset the net deltas from futures + short options.

  • The deltas for the shock (DeltaForShock) are the net delta of futures + short options that are not offset by the net delta from long options.

  • These are then converted to dollar deltas by multiplying by the index, and the amount in excess of the Delta Total Liquidity Shock Threshold are multiplied by the increment used in standard margin for the perpetual, and if no perpetual, then for the dated future.

  • A cap is applied to this charge: the Max Delta Shock.

DeltaForShock = { | min ( max ( Delta1 + Delta2 , Delta2 ) , 0 ) | , if Delta2 < 0, | max ( min ( Delta1 + Delta2 , Delta2 ) , 0 ) | , if Delta2 ≥ 0 \text{DeltaForShock}=\begin{cases}|\min(\max(\text{Delta1}+\text{Delta2},\text{Delta2}),0)|,&\text{if Delta2}<0,\\|\max(\min(\text{Delta1}+\text{Delta2},\text{Delta2}),0)|,&\text{if Delta2}\geq0\end{cases}

Where:

  • Delta1 = net delta of long options

  • Delta2 = net delta of short options + delta of futures

The delta shock is then calculated with the following formula.

DeltaShock = ∑ eachCurrencyPair min [ max ( DeltaForShock × Index − DeltaTotalLiquidityShockThreshold , 0 ) × DeltaForShock × Increment , MaxDeltaShock × Index × DeltaForShock ] Index × Index versus the settlement currency, if it is a Linear Instrument (the settlement currency is USDC or USDT) \text{DeltaShock}=\sum_{\text{eachCurrencyPair}}\frac{\min[\max(\text{DeltaForShock}\times\text{Index}-\text{DeltaTotalLiquidityShockThreshold},0)\times\text{DeltaForShock}\times\text{Increment},\text{MaxDeltaShock}\times\text{Index}\times\text{DeltaForShock}]}{\text{Index}}\times\text{Index versus the settlement currency, if it is a Linear Instrument (the settlement currency is USDC or USDT)}

Segregated Portfolio Margin Roll Shocks

  • Roll Shock is calculated per base currency in each settlement currency.

  • First a Minimum Roll Shock is calculated as shown in the formula, using the Net Delta per Expiry.

  • Then an Annualised Roll Shock is calculated as shown in formula.

  • The Roll Shock per base currency in each settlement currency is then summed across all the base currencies to give a Final Roll Shock in each settlement currency.

Minimum Roll Shock = ∑ Expiry Min Annualised Move × { | min ( max ( Net Δ Expiry , Delta2 Expiry ) , 0 ) | , if Delta2 Expiry < 0 | max ( min ( Net Δ Expiry , Delta2 Expiry ) , 0 ) | , if Delta2 Expiry ≥ 0 \text{Minimum Roll Shock}=\sum_{\text{Expiry}}\text{Min Annualised Move}\times\begin{cases}|\min(\max(\text{Net}\Delta_{\text{Expiry}},\text{Delta2}_{\text{Expiry}}),0)|,&\text{if }\text{Delta2}_{\text{Expiry}}<0\\|\max(\min(\text{Net}\Delta_{\text{Expiry}},\text{Delta2}_{\text{Expiry}}),0)|,&\text{if }\text{Delta2}_{\text{Expiry}}\geq0\end{cases}

Annualised Roll Shock of Delta2 = ∑ Expiry max ( e Annualised Move Risk × Years to Expiry − 1 , Min Annualised Move ) × Delta2 Expiry \text{Annualised Roll Shock of Delta2}=\sum_{\text{Expiry}}\max(e^{\text{Annualised Move Risk}\times\text{Years to Expiry}}-1,\text{Min Annualised Move})\times\text{Delta2}_{\text{Expiry}}

Annualised Roll Shock of Delta = ∑ Expiry max ( e Annualised Move Risk × Years to Expiry − 1 , Min Annualised Move ) × Net Δ Expiry \text{Annualised Roll Shock of Delta}=\sum_{\text{Expiry}}\max(e^{\text{Annualised Move Risk}\times\text{Years to Expiry}}-1,\text{Min Annualised Move})\times\text{Net}\Delta_{\text{Expiry}}

Annualised Roll Shock = { | min ( max ( Annualised Roll Shock of Delta , Annualised Roll Shock of Delta2 ) , 0 ) | , if Annualised Roll Shock of Delta2 < 0 | max ( min ( Annualised Roll Shock of Delta , Annualised Roll Shock of Delta2 ) , 0 ) | , if Annualised Roll Shock of Delta2 ≥ 0 \text{Annualised Roll Shock}=\begin{cases}|\min(\max(\text{Annualised Roll Shock of Delta},\text{Annualised Roll Shock of Delta2}),0)|,&\text{if Annualised Roll Shock of Delta2}<0\\|\max(\min(\text{Annualised Roll Shock of Delta},\text{Annualised Roll Shock of Delta2}),0)|,&\text{if Annualised Roll Shock of Delta2}\geq0\end{cases}

Final Roll Shock = ∑ Base Currency max ( Minimum Roll Shock , Annualised Roll Shock Base Currency ) × { 1 , Inverse Instruments (BTC, ETH) Index versus the settlement currency, Linear Instruments (USDC, USDT) \text{Final Roll Shock}=\sum_{\text{Base Currency}}\max(\text{Minimum Roll Shock},\text{Annualised Roll Shock}_{\text{Base Currency}})\times\begin{cases}1,&\text{Inverse Instruments (BTC, ETH)}\\\text{Index versus the settlement currency,}&\text{Linear Instruments (USDC, USDT)}\end{cases}

where Delta2 = net delta of short options + delta of futures

Note

Note that the Perpetual deltas are considered as the Perpetual being its own expiry with time to expiry equal to 0

Note

Note that in the API, the Min Expiry Delta Shock is shown as min_annualised_move

Cross Portfolio Margin (X:PM) 

Cross Portfolio Margin (X:PM) extends the capabilities of Segregated Portfolio Margin (S:PM) by allowing the use of multiple collateral types across the available instruments and settlement currencies. In X:PM, equity is treated as a position, and all positions across different assets are aggregated in a single risk matrix. This allows, for example, for BTC equity to be used to open positions in USDC or ETH settled instruments, and vice versa. The model calculates margin by simulating the impact of price movements across multiple currencies, resulting in a USD-based Initial and Maintenance Margin.

Cross Portfolio Margin vs Segregated Portfolio Margin

  • With Cross Portfolio Margin (X:PM) all the positions in all settlement currencies are looked at together in a single risk matrix.

  • This allows currencies other than the settlement currency of an instrument to be used as margin to support orders and positions in the instrument.

  • Roll Shocks are calculated per base currency (instead of first being grouped by settlement currency and then by base currency, as is done in Segregated Portfolio Margin).

  • Delta Shocks are still calculated by currency pair, which means a very large spread between BTC-PERPETUAL and BTC_USDC-PERPETUAL, for example, would get shocked.

  • The output is calculated in USD, giving a USD row in the Account Summary, but this USD output is also converted into each Settlement Currency for the sake of backward compatibility. It is important to note that the sum of your BTC, ETH, USDC, and USDT Margin Balance and margins will not be equivalent to your USD Margin Balance and margin.

Cross Portfolio Margin Components

The model treats equity as a position and looks at all positions in equity, futures, options in all currencies in one matrix and nets positions based on the same base currency. PM Initial Margin is determined by calculating the worst performing scenario for the portfolio, with the following components: 

  • For the Main Table, the Price Range is defined per Currency Pair and defines the Underlying Price Move buckets. The buckets are -4, -3, -2, -1, 0, +1, +2, +3, +4, and the underlying price move for an instrument is the bucket number * Price Range / 4. For example, if the Price Range for a particular currency is 16%, then bucket -3 will look at an underlying price move of -3 * 16%/4 = -12%.

  • Volatility Stress Scenarios (Volatility Range Up, Same, and Down) are calculated for each bucket of underlying price move.

  • Extended Table - this is primarily meant to account for large short options positions that are far out of the money.

    • Calculations of price moves of, e.g. -66%, -33%, +50%, +100%, +200%, +300%, +400%, +500%

    • Only on Volatility Range Up

    • Only a fraction of simulated P&L

    • Application of a dampener

    Note

    stETH is grouped within ETH’s bucket in the Extended Table.

  • Delta Shock.

  • Roll Shock.

  • For the PNL calculations in the table, USDC and USDT settled instruments are first calculated as in Segregated PM but then multiplied by the USDC_USD and USDT_USD indices respectively, to get the USD PNL. For BTC and ETH settled instruments, they are first calculated as in Segregated PM but then multiplied by the BTC and ETH indices respectively to get the USD PNL.

  • Position Initial Margin = Worst case loss scenario of risk matrix (including extended table) per Base Currency + Delta Shock + Roll Shock

  • Maintenance Margin = Position Initial Margin * Maintenance Margin Factor

    (the default Maintenance Margin Factor is 0.80)

  • Position Initial Margin is added with the Initial Margin for open orders and Initial Margin for MMP Settings to give the final Initial Margin.

  • For certain currencies, haircuts are applied. For more info, see Cross collateral specifications.

Cross Portfolio Margin Delta Shock

  • Delta shock is calculated per currency pair for large delta positions, and  gives a result in USD (unlike S:PM which gives a result in the settlement currency).

  • The net delta on long option positions is looked at separately to futures + short option positions.

  • The net deltas on long options are not taken into account unless they help offset the net deltas from futures + short options.

  • The deltas for the shock (DeltasForShock) are the net delta of futures + short options that are not offset by the net delta from long options.

  • These are then converted to dollar deltas by multiplying by the index and the amount in excess of the Delta Total Liquidity Shock Threshold are multiplied by the increment used in standard margin for the perpetual, and if no perpetual, for the dated future. 

  • A cap is applied to this charge: the Max Delta Shock.

DeltaForShock = { | min ( max ( Delta1 + Delta2 , Delta2 ) , 0 ) | , if Delta2 < 0, | max ( min ( Delta1 + Delta2 , Delta2 ) , 0 ) | , if Delta2 ≥ 0 \text{DeltaForShock}=\begin{cases}|\min(\max(\text{Delta1}+\text{Delta2},\text{Delta2}),0)|,&\text{if Delta2}<0,\\|\max(\min(\text{Delta1}+\text{Delta2},\text{Delta2}),0)|,&\text{if Delta2}\geq0\end{cases}

Where

  • Delta1 = net delta of long options

  • Delta2 = net delta of short options + delta of futures

DeltaShock = ∑ eachCurrencyPair min [ max ( DeltaForShock × Index − DeltaTotalLiquidityShockThreshold , 0 ) × DeltaForShock × Increment , MaxDeltaShock × Index × DeltaForShock ] × StableIndex \text{DeltaShock}=\sum_{\text{eachCurrencyPair}}\min[\max(\text{DeltaForShock}\times\text{Index}-\text{DeltaTotalLiquidityShockThreshold},0)\times\text{DeltaForShock}\times\text{Increment},\text{MaxDeltaShock}\times\text{Index}\times\text{DeltaForShock}]\times\text{StableIndex}

StableIndex = { 1 , if Settlement Currency is BTC, ETH USDC_USD Index, if Settlement Currency is USDC USDT_USD Index, if Settlement Currency is USDT \text{StableIndex}=\begin{cases}1,&\text{if Settlement Currency is BTC, ETH}\\\text{USDC\_USD Index,}&\text{if Settlement Currency is USDC}\\\text{USDT\_USD Index,}&\text{if Settlement Currency is USDT}\end{cases}

Cross Portfolio Margin Roll Shock

  • Roll Shock is calculated per base currency and gives a result in USD (unlike S:PM which gives a result in the settlement currency).

  • First a Minimum Roll Shock is calculated as shown in the formula, using the Net Notional USD Delta per Expiry.

  • Net Notional USD Delta = Net Delta * Index

  • Then an Annualised Roll Shock is calculated as shown in formula.

  • The Roll Shock per base currency is then summed across all the base currencies to give a Final Roll Shock in each settlement currency.

Minimum Roll Shock = ∑ Expiry Min Annualised Move × { | min ( max ( NetNotionalUSD Δ Expiry , NetNotionalUSD Δ 2 Expiry ) , 0 ) | , if NetNotionalUSD Δ 2 Expiry < 0 | max ( min ( NetNotionalUSD Δ Expiry , NetNotionalUSD Δ 2 Expiry ) , 0 ) | , if NetNotionalUSD Δ 2 Expiry ≥ 0 \text{Minimum Roll Shock}=\sum_{\text{Expiry}}\text{Min Annualised Move}\times\begin{cases}|\min(\max(\text{NetNotionalUSD}\Delta_{\text{Expiry}},\text{NetNotionalUSD}\Delta2_{\text{Expiry}}),0)|,&\text{if }\text{NetNotionalUSD}\Delta2_{\text{Expiry}}<0\\|\max(\min(\text{NetNotionalUSD}\Delta_{\text{Expiry}},\text{NetNotionalUSD}\Delta2_{\text{Expiry}}),0)|,&\text{if }\text{NetNotionalUSD}\Delta2_{\text{Expiry}}\geq0\end{cases}

Annualised Roll Shock of Delta2 = ∑ Expiry max ( e Annualised Move Risk × Years to Expiry − 1 , Min Annualised Move ) × NetNotionalUSD Δ 2 Expiry \text{Annualised Roll Shock of Delta2}=\sum_{\text{Expiry}}\max(e^{\text{Annualised Move Risk}\times\text{Years to Expiry}}-1,\text{Min Annualised Move})\times\text{NetNotionalUSD}\Delta2_{\text{Expiry}}

Annualised Roll Shock of Delta = ∑ Expiry max ( e Annualised Move Risk × Years to Expiry − 1 , Min Annualised Move ) × NetNotionalUSD Δ Expiry \text{Annualised Roll Shock of Delta}=\sum_{\text{Expiry}}\max(e^{\text{Annualised Move Risk}\times\text{Years to Expiry}}-1,\text{Min Annualised Move})\times\text{NetNotionalUSD}\Delta_{\text{Expiry}}

Annualised Roll Shock = { | min ( max ( Annualised Roll Shock of Delta , Annualised Roll Shock of Delta2 ) , 0 ) | , if Annualised Roll Shock of Delta2 < 0 | max ( min ( Annualised Roll Shock of Delta , Annualised Roll Shock of Delta2 ) , 0 ) | , if Annualised Roll Shock of Delta2 ≥ 0 \text{Annualised Roll Shock}=\begin{cases}|\min(\max(\text{Annualised Roll Shock of Delta},\text{Annualised Roll Shock of Delta2}),0)|,&\text{if Annualised Roll Shock of Delta2}<0\\|\max(\min(\text{Annualised Roll Shock of Delta},\text{Annualised Roll Shock of Delta2}),0)|,&\text{if Annualised Roll Shock of Delta2}\geq0\end{cases}

Final Roll Shock = ∑ Base Currency max ( Minimum Roll Shock , Annualised Roll Shock Base Currency ) \text{Final Roll Shock}=\sum_{\text{Base Currency}}\max(\text{Minimum Roll Shock},\text{Annualised Roll Shock}_{\text{Base Currency}})

where NetNotionalUSDΔ = net delta × index price in USD

NetNotionalUSDΔ2 = (net delta of short options + delta of futures) × index price in USD

Note

Note that the Perpetual deltas are considered as the Perpetual being its own expiry with time to expiry equal 0 

Note

Note that in API, the Min Expiry Delta Shock is shown as min_annualised_move

Portfolio Margin Models Specification

Long Options In Portfolio Margin Accounts

When using portfolio margin, it is important to be aware that it is possible for a portfolio made up solely of long options to be liquidated. This is because the way margin requirements are calculated in portfolio margin accounts allows for a small amount of leverage to be achieved even when only buying options.

This differs from standard margin accounts, where the margin for long options is kept separate. To avoid accidental liquidation with portfolios consisting of only long options, traders may wish to do so in a subaccount that uses standard margin, rather than portfolio margin.

Portfolio Margin Model Parameters

Parameters for the model can be found on the PM page (https://www.deribit.com/account/BTC/portfolio-margin). This shows parameters based on the instruments you have in your position. To see all parameters, you can use the API call public/pme/get_params.

Parameters for the model can be found on the PM page (https://www.deribit.com/account/BTC/portfolio-margin). This shows

"Extended Dampener" is used for the extended table.

"Min Expiry Delta Shock", and "Annualised % move risk" are used for the roll shock.

"Equity Impact" applies only to X:PM accounts for equity in the risk matrix.

"Price Range" is used for the main table.

"Volatility Range Up", "Volatility Range Down", "Min Volatility For Shock Up", "Short Term Vega Power", and "Long Term Vega Power", are all used for volatility shocks.

"Delta Total Liquid. Stock Threshold", and "Max Delta Shock" are used for delta shock.

Portfolio Margin Risk Matrix Structure

  • Each calculated value in the table represents a simulated PNL for that instrument for a particular underlying move and volatility shock.

  • For Cross PM only: Equity can be used to offset positions in X:PM. For example, XRP equity can offset short XRP calls.

  • Haircuts are not applicable under S:PM.

  • The portfolio margin risk matrix includes the main table in the centre, and an extended table to the downside (left) and upside (right).

The portfolio margin risk matrix includes the main table in the centre, and an extended table to the downside (left) and
The portfolio margin risk matrix includes the main table in the centre, and an extended table to the downside (left) and

Portfolio Margin Risk Matrix Calculations

Portfolio Margin Risk Matrix Calculations

The worst performing scenario is marked at the top of the risk matrix with a red arrow.

The worst performing scenario is marked at the top of the risk matrix with a red arrow.
The worst performing scenario is marked at the top of the risk matrix with a red arrow.

AdjustedSimulatedPNL

For the final risk matrix calculations, only a fraction of the SimulatedPNL is used from the Extended Table and a dampener is also used in this section. The fraction for each bucket in the Extended Table are calculated as below.

First, a MarginMultiplier is calculated as:

MarginMultiplier = ExtendedFactor * PriceRange / |PriceMove|

Next, an AdjustedSimulatedPNL is calculated.

For linear (settled in USDC or USDT) instruments in an S:PM account, and for all instruments in an X:PM account, the AdjustedSimulatedPNL is calculated as:

AdjustedSimulatedPNL = SimulatedPNL * MarginMultiplier

For inverse (settled in BTC or ETH) instruments in an S:PM account, the AdjustedSimulatedPNL is calculated as:

AdjustedSimulatedPNL = SimulatedPNL * MarginMultiplier(1 + PriceMove) / (1 + Sign(PriceMove) * PriceRange)

AmountToBeDampened

For the Main Table and Extended Table, we sum the rows on each base currency to get a matrix output grouped by base currency. In this step, BTCDVOL is grouped with BTC. For the Extended Table, we then apply a dampener to reduce it’s impact. It means that only very large option positions will cause an impact in the Extended Table.

For linear (settled in USDC or USDT) instruments in an S:PM account, and for all instruments in an X:PM account, the AmountToBeDampened is calculated as:

AmountToBeDampened = min( (max(|PriceMove| / PriceRange, 1) - 1) * ExtendedDampener, |AdjustedSimulatedPNL|)

For inverse (settled in BTC or ETH) instruments in an S:PM account, the AmountToBeDampened is calculated as:

AmountToBeDampened = min( (max(|PriceMove| / PriceRange, 1) - 1) * ExtendedDampener / ((1 + Sign(PriceMove) * PriceRange) * Index), |AdjustedSimulatedPNL|)

Margin Summary

On the Portfolio Margin page, above the Risk Matrix, you will see a summary of the margin.

On the Portfolio Margin page, above the Risk Matrix, you will see a summary of the margin.

This table displays the values for:

  • Worst Case Scenario

  • Basis Shock

  • Delta Shock

  • Effective Equity Margin

  • Decoupling Shock

  • Open Orders Margin

  • MMP Margin

  • Spot Reserve

Note

Note that the "Worst Case Scenario" as it is named in the portfolio margin calculation, is simply the worst result from the tested scenarios. It does not imply that it is the largest amount the account could lose.

Covered calls using offset currencies as collateral (X:PM)

  • Offset currencies are not full cross collateral currencies in the same way as BTC, ETH, USDC, USDT, PAXG etc. See the cross collateral specifications for which currencies are currently classified as offset-only. Offset currencies are used to offset upside risk only in the respective currency in the Risk Matrix. This is represented by the presence of an offset currency balance in the risk matrix, with positive values in the upside ranges.

  • A client entering a covered call setup on Cross PM needs to hold USDC, USDT, BTC or any of the other cross collateral currencies to be able to enter the covered call positions. They also need to maintain a certain balance of these currencies as collateral (as these are part of the Margin Balance, while an offset currency is not).

  • The Margin Balance (BTC, ETH, USDC, and other cross collateral currencies) is compared to the Initial and Maintenance Margins (IM and MM ratios) to determine if a client is breaching their margin requirements. An MM ratio above 100% would trigger a liquidation. Offset currencies are not included in Margin Balance.

  • In addition to up and down scenarios, we also perform vol up and vol down shock scenarios. This will determine the margin requirements on the position, which need to be posted in cross collateral currencies (USDC, USDT, etc), not in an offset-only currency.

  • The client should especially consider the upside risk, where their USDC equity would become lower as underlying is increasing as a result of his short options. Because an offset-only currency is not part of the Margin Balance, this could result in an insufficient Margin Balance to cover their Maintenance Margin requirements, thus resulting in a liquidation. To avoid this scenario, the client should also ensure there is a sufficient amount of cross collateral currencies in the account (BTC, ETH, USDC, USDT, etc.).